Recent Projects
Wolf Creek Wastewater System
Project includes construction of the new wastewater collection system, new lift station and wastewater treatment facility.
Broadwater Spillway Rubber Gate Replacement
Projected consists of installation of new inflatable rubber gates that are 11 and ½ feet high and 82 feet long, each.
South Jetty Dune Stabilization
Project consisted of constructing a dynamic revetment to an elevation of 22.00 along the shoreline.